Project Description
The London Overground Capacity Improvement Programme (LOCIP) increased capacity on the London Overground network with 4 Car Trains converted to 5 Car configurations. This required the provision of new stabling facilities at Silwood Sidings to provide housing for trains relocated from New Cross Gate Depot due to the additional length. RCSG carried out SSI data design and verification to support these works drawing on the experience of RCSG staff with UK signalling principles and design standards.
Project Name
London Overground Capacity Improvement Program
Client
London Overground network
United Kingdom
2015