Projects

Lemahabang Solid State Interlocking Modifications

Client: Transport System Solutions
Duration of works: 2011 - 2011
Location: Lemahabang, Indonesia

Overview:

  • Updated Solid State Interlocking (SSI) data over two stages to accommodate revised operational requirements of the Jababeka Dry Port development.
  • Expanded freight lines with the addition of a branch line and associated signalling changes.
  • Upgraded level crossing controls.
  • Commissioned new interlocking data.
  • The scope included project engineering, data design, independent verification, principles testing and the installation and commissioning of new SSI data.